| NO. | Project Description | Client |
|---|---|---|
| 1. | CMS PC upgrading for 3 quay cranes G4, G5 and G6. The original iFix CMS is retained. The CPU model is GE 90-30, and communication is via Ethernet and BNC connector. The GE DC2000 drives are connected via RS232 and GE Control Toolbox software. | Penang Port, Malaysia |
| 2. | 12 sets of CISCO wireless bridge systems are installed for connecting TCM RTG cranes to North Port Intranet. Root and Non-root bridges are configured. CISCO wireless bridge AIRONET 1310 model is used. WGB model is configured. | North Port, Malaysia |
| 3. | CMS PC upgrading for 6 RTG Facvo cranes. The original SICMA CMS is retained. The CPU model is Siemens S7-400, and communication is via Ethernet and CP431. | PTP, Malaysia |
| 4. | CMS PC upgrading for 36 Hanjung RTG cranes. The original GE Cimplicity CMS is retained. The CPU model is GE 90-30, and communication is via Ethernet and UTP connector. | PTP, Malaysia |
| 5. | CMS PC upgrading for 14 IMPSA quay cranes. The original Fix32 CMS is retained. The CPU model is GE 90-30, and communication is via Ethernet and BNC connector. | PTP, Malaysia |
| 6. | Installation and Testing of CMS systems on MHI and IMPSA quay cranes. The PLC is Yaskawa (Extended MEMOBUS) for MHI cranes, and Telemecanique (MODBUS ASCII) for IMPSA cranes. | Johor Port, Malaysia |
| 7. | 1 set of CMS System for IMPSA quay crane is installed. The PLC CPU is Telemecanique TSX PLC. Modbus ASCII protocol is used to communicate between CMS and PLC. | Kuantan Port, Malaysia |
| 8. | CMS configuration for Noell crane N1. A new converter from AUI to UTP is provided to communicate between Siemens CP443-1 and SICMA CMS PC. | West Port, Malaysia |